Please use this identifier to cite or link to this item: https://elibrary.khec.edu.np:8080/handle/123456789/653
Title: DETAILED ENGINEERING SURVEY, DESIGN AND COST ESTIMATION OF GYAMPEDANDA TO KAKROBARI (CLASS IV) ROAD
Authors: ATISH MAHAT (740209)
BIJEN SUWAL (740213)
BIKRAM MAHARJAN (740215)
DEVRAJ SHRESTHA (740220)
Advisor: Er Shakil Manandhar
Issue Date: Aug-2022
College Name: Khwopa Engineering College
Level: Bachelor's Degree
Degree: BE Civil
Department Name: Department of Civil
Abstract: Transportation is the backbone of a nation, its impact on the progress and functioning of a developing country as ours is vital to say the least. Among the various modes of transportation roadways are especially crucial in Nepal, due to reasons like general topography and economy of the country. Accounting for the importance of roadways The Government of Nepal has prioritized the development of roadways at the very top. This project aims to design and construct a roadway connecting Ghyampedanda and Kakrobari along with the required Quantitative and Financial estimate. The project employs Open Traverse survey method, software like AutoCAD, SW-DTM and SW-Road v2 for the design and estimation. Road design parameters were taken as guided by NRS2070. Pavement design was carried out using Overseas Roadnote-31 for flexible pavement and IRC: 58-2002 for rigid pavement. The main objective of the project work is to achieve the working level of knowledge and practical understanding for the construction, design of road and its estimation. This report is an outcome of our hard work and perseverance. Any opinions, suggestions or criticism for the project would be appreciated.
URI: https://elibrary.khec.edu.np/handle/123456789/653
Appears in Collections:PU Civil Report

Files in This Item:
File Description SizeFormat 
Final Year Project Report Group R.pdf
  Restricted Access
31.56 MBAdobe PDFThumbnail
View/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.